|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Sub-Division Features include:
*Note:
Storm Water Management - There are three major collection basins on this
300 acre site which control all surface storm water run-off. All individual
lots are sold on a net acreage basis (no additional storm water ponding
required). |
The "Patton Industrial Centre" has created a business park to meet all industrial size lot requirements.
(Click on image to view/print larger image) Contact
Randy Murray at Royal LePage |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||